Hydro-Agricultural Infrastructure

Developing countries are facing rural development challenges due to the scarcity of water resources, the lack of crop diversification, the scarcity of arable land and the consequent precariousness of rural populations, to which governments and communities have become aware of by implementing public policies to sustainably reverse the trend, improve their incomes and curb rural exodus.

INTEGC contributes to the sustainable development of rural areas which are potential sources of food security and supply for urban agglomerations. Indeed, these countries are deploying investment programmes to develop rural areas, settle their populations and increase their contribution to the economic growth.

In this respect, INTEGC carries out partial or complete supervising missions and various expertise studies on hydro-agricultural infrastructure projects and thus provides a response adapted to the needs of the rural world.

The company's activity includes several potential study missions, such as:

  • Diagnostic studies;
  • Feasibility studies;
  • Preliminary design;
  • Final design;
  • Preparing Contractors Shortlist File

Subsequently, INTEGC carries out, if necessary, the quality control of the corresponding works to be performed by providing the following services:

  • Project compliance review and endorsement of the working design (EXE);
  • Supervision of the execution of the construction works contract (DET);
  • Scheduling, steering and control (OPC);
  • Assistance during acceptance operations and during the guarantee period (AOR);

As well as various expert appraisals.